Lisson Green Estate Major Works (project V120/B)

Current status

Project status 1
Initial planning

Deciding the scope of the works 

Project status 2
Project design and approval

Finalising the project specification, budget and programme

Project status 3
Onsite
Work starts: 17/11/2019
Work ends: 31/07/2023
Project status 4
Completion

End of works and the defects period 

Project details

Read the Residents' Information Booklet, which contains all the information you need to know about the project.

Click on the blocks listed below for a summary of the planned work. 

Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.
Work Element Description of Works
Condition Surveys A condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with |WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage.
Access Required Blocks: All Generally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals.
Roofs / Walkways Repairs and replacement of damaged tiles to tiled pitched roofs to (low level roofs only)Loose lay insulation in to all roof voids to current regulation
Rainwater Goods Replacement of broken and leaking gaskets and gutter joints. Repairs and localised replacement of corroded and failing rainwater goods and foul drainage pipeworkReplacement of undersized down pipes.
Drainage Works CCTV drainage survey required
External Repair works Repairs and localised replacement of walkway waterproofing finishes (asphalt).Walkway sub-structure (concrete) repairs.Wash down of all soffits and fascias. Render and concrete repairsCleaning of external facades including grills and the like.Masonry repairs.Replacement and repair of boiler flue cowlings.Localised cleaning of pre-finished render where stained.Localised hard and soft landscaping repair works.Repair and replacement of bin store doors.
External Decorations Decoration of all previously painted surfaces – Includes blocks and all areas to boundary.Include for decoration of all garage doors and frames with appropriate paint.
Windows Full inspection of windows with ease and adjust of existing aluminium windows, replacing broken ironmongery, rubber seals and blown double glazed units where required.
Internal Areas Internal decoration and repairs (including Class 0 paint).Repair and localised replacement of vinyl flooring works.Renew all floor matwells.Repairs to floor surface including stair nosings.Replacement of tenanted front entrance doors.Replacement of damaged and broken window boards.
Estate Work Repair bin stores.
Electrical Work Install emergency lighting to BS5266 including within SME within roof voids.
Fire Risk Assessment (FRA) Works All Blocks Install No smoking and Fire Action notices.Install "Fire door keep shut" / "Fire door keep locked" signage to all communal fire doors.Improvements to compartmentalisation to SME within roof voids.Install new directional fire signage.Replace communal fire doors and riser doors.Replacement of all flat entrance doors (tenant only), rear communal door and landlords electrical cupboard door;Sealing of penetrations through floors and walls Individual block works to note; • Communal fire doors & riser doors (all blocks)• Fire signage (all blocks)• Compartmentalisation to SME within roof void (all blocks)• Emergency lighting within roof voids (all blocks)• “push bar to open” signage (Kimble House)• Interface AFD within roof void with auto dialler (Verney House)• Retrofit override keys to door entry system (Risborough House) • Compartmentalisation of staircases (Linslade House) Contractor to provide FRA works plan prior to commencement agreement.

Published: 21 January 2021

Last updated: 25 April 2024