Skip to main content

Warwick Low Rise Solar PV Panel Scheme (Project AD926)

Current status

Project status 1
Initial Planning

Deciding the scope of the works.

Project status 2
Project design and approval

Finalising the project specification, budget and programme. 

Project status 3
Onsite
Work starts: 24/10/2022
Work ends: 12/04/2024
Project status 4
Completion

End of works and the defects process.

Project update

This project is now complete. The solar panels, also referred to as PV panels, have been successfully installed. 

UK Power Network (UKPN) and our contractors Axis Europe and Oakray have connected them up so that we can capture the electricity generated. This is being stored in large batteries and used to power the communal supplies locally. At a later date we may start using any surplus power to supply the national grid. 

We would like to thank those residents for their patience when we had to temporarily disconnect the power supply as part of the UKPN connection work. 

 

Published: 2 May 2024

Last updated: 20 June 2024