Vale Royal House Major Works (project X107)

Current status

Project status 1
Initial planning

Deciding the scope of the works

Project status 2
Project design and approvals

Finalising the project specification, budget and programme

Project status 3
Onsite
Work starts: 21/07/2021
Work ends: 31/12/2023
Project status 4
Completion

End of works and defects period 

Project outline

Our contractor, United Living, is carrying out major works at Vale Royal House.

The scope of the work includes:

  • Brickwork repairs.
  • Replacement windows.
  • Replacement of tenants’ front entrance doors, with an opt-in for leaseholders.
  • Replacement of communal fire doors and utility doors.
  • Communal repairs and decorations (including flooring).
  • Replacing the lateral and rising mains (electrical supply).
  • Lighting upgrade.
  • In-flat ventilation works (renew extract grille &damper, install fire damper).
  • Cleaning of extract ductwork, this includes replacement communal fans at roof level.
  • Timber and metalwork repairs.
  • External decorations (to previously painted surfaces).
  • Waterproofing the podium area.
  • Drainage repairs (including CCTV survey).
  • Repairs to rainwater goods.
  • New door entry system.
  • Fire Risk Assessment (FRA) works.
  • Concierge desk, CCTV monitoring station and welfare facility. Removed from the scope due to spatial restrictions.
  • Replacement of suspended ceiling.

For questions about the work onsite please contact Abdul, your resident liaison officer, on 07817 163 522, or [email protected]