Current status
Project status
1
Initial planning
Deciding the scope of the works
Project status
2
Project design and approval
Finalising the project specification, budget and programme
Project status
3
Project status
4
Completion
End of works and the defects period
Project details
You can read the Residents' Information Booklet here or click on the blocks listed below for a summary of the planned work.
Work Element | Description of Works |
---|---|
Condition Survey | Blocks: AllA condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage. |
Access Required | Blocks: AllGenerally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals. |
Access Hatches/Door(s) | Blocks: AllSurvey/ review all current access doors/ hatch provisions, including any ladder access requirements.Optimised access solutions are to be proposed by the ServiceProvider giving due consideration to the size, positioning and specification of any new access doors/ hatches/ ladders required in order to facilitate future access requirements for plant maintenance/ replacement in a safe and efficient manner.Recommendations and proposals, with estimated costs, are to be provided by the Service Provider within their Project Execution Plan. |
Ductwork Cleaning | Blocks: AllSpecialist ductwork cleaning company to clean the existing ductwork system and in accordance with CIBSE/BSRIA and HVAC TR19 publications. All ductwork to be cleaned including the branch ductwork from inside each flat.Post clean report to be provided to include photos of pre and post condition. |
Extract Fans | Blocks: AllReplace existing extract fans, silencers, local ductwork, dampers and controls within the plantroom.The contractor is to ensure that there will be minimum down time and shall always be provided with extract ventilation.Works to comply with the current regulations. |
Ductwork, dampers and fittings | Blocks: AllSupply, install and connect all associated ductwork, dampers and fittings involved with replacing the fans. |
Electrical – Lighting | Blocks: AllSurvey / review existing lighting systems associated with The Works and, where necessary, replace existing/ install new systems to comply with current regulatory requirements and CIBSE recommended levels (minimum illumination of 200lux in all plant room spaces required).The Lighting installation is to include emergency lighting provisions in accordance with BS 5266 Emergency Lighting requirements.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken. |
In flat works | Blocks: AllClean local ductwork.Replace the grille and control damper.Install new/replace existing fire dampers.Improvements to make-up air/trickle vents. |
Electrical – power | Blocks: AllSurvey/ review existing electrical power supply installations associated with The Works and where necessary replace existing/ install new systems in compliance with current regulatory requirements.Small Power (240V) provision (minimum 1no double switched socket outlet) is to be provided in reasonably ‘close proximity’, and ideally ‘within’, all plant room spaces for future maintenance and essential repair operations.Provide a complete system of earthing and supplementary bonding installation to all items associated with The Works to meet the current edition of the IEE wiring regulations.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken.Replace existing containment systems for both power and lighting wiring.Provide supplementary earth bonding to external metallic containment. |
Existing plastic containment | Blocks: Brunswick and DalkeithProvide new containment which shall be metal powder coated. Installed in line with BS EN 50085-1:2005 and shall be suitably earthed.Note – containment to be sized as such that all existing cabling can be relocated from old plastic conduit and mounted within new powder coated containment |
Walkways/access | Blocks: AllSurvey/ review all existing walkway/ access route provisions and where deemed necessary provide proposals, with estimated costs, for the design, supply, install and/ or replace, repair, renovate or renew:Designated walkways to provide access for the future safe and efficient maintenance and/ or plant replacement of all CWST’s and associated components;Protective covers/ step-overs to any associated components that may cross over/ under the designated routes where deemed to be susceptible to future degradation in the absence of any such protective measures. |
Builders work | Blocks: AllCarry out all builders work in connection with The Works including subsequent making good of all disturbed finishes to a standard acceptable by WCC.Provide recommendations and for any builders-work style items felt necessary (such as any minor building-fabric style repairs or decorative items associated with The Works areas), for review and further instruction by WCC– a Provisional Sum in relation to any such works should be included at PEP stage;Replace/ make good/ repair existing water tank bunds if required. |
Maintaining Services | Blocks: AllMaintain the extract system during the duration of the contract. |
Associated Fire Safety Works | Blocks: AllCarry out all fire stopping associated with the works. All fire stopping works must be undertaken by an accredited party of an appropriate ‘industry-recognised’ body.Review all FRA’s and investigate/ establish Fire Strategies for the properties in relation to the areas affected by The Works. Identify all works deemed necessary and associated with The Works to ensure all Fire Strategy requirements are complied with. Provide recommendations, with estimated costs, for the execution of these works.Report findings with respect to recommendations to WCC for any further works that may be deemed appropriate in regard to Fire Protection matters for WCC consideration and further direction/ instruction.Ensure The Works are fully compliant with current Fire Regulatory requirements. |
Asbestos Survey | Blocks: AllComply with all statutory and regulatory requirements with respect to Asbestos. Ensure an asbestos R&D survey is carried out prior to any works being undertaken.Existing Asbestos registers have been provided as part of the Client Brief package of information where they exist. The Service Providers Project Execution Plan needs to identify any further works, with estimated costs, for assessing the information available and then for completing all necessary surveys/ works to identify and manage/ remove Asbestos hazards associated with The works. |
Other Potentially Hazardous Circumstances | Blocks: AllIn addition to Asbestos management (as noted above) there may be other potentially hazardous circumstances that the Service Provider will need to address.Undertake all surveys as necessary to establish the existence of all potentially hazardous materials, substances and/ or environmental conditions. Procure and execute all works necessary to clear away any such hazards to the extent necessary in order to facilitate future surveys and execution of The Works.Provide recommendations for any additional measures that may be deemed necessary to prevent re-contamination. |
O&M Manual | Blocks: AllProvide Health and Safety File and Operating & Maintenance manuals for all systems associated with The Works, to include (but not limited to);A detailed future Planned Preventative Maintenance (PPM) programme/ regime associated with The Works;Future Plant Replacement Strategies, with estimated costs, for each property for further review/ consideration/ instruction as appropriate, by CWH;As-built drawings, specifications, schematics, schedules, valves charts, etcManufacturers details and warranties (as applicable) |
Asset tagging | Blocks: AllAppoint an asset tagging company (Stics AMS or approved equivalent) to supply, install and carry out the installation, programming and commissioning of asset tags to new items upon completion of works.All main plant & equipment components associated with The is to be scheduled by the Service Provider within their PEP. The Service Provider is to provide a proposed Asset Tagging Register of all components for review and approval by WCC. |
Fire Safety works | Blocks: AllCarry out all relevant works identified and set out in the FRAs within Appendix 3 and compartmentation reports as carried out by the service provider. All fire safety works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works. Blocks: Brunswick and Dalkeith Fire Signage survey required – implement fire signage to current regulationsInstall new emergency lighting to staircase enclosures and corridors to BS5266Carry out fire stopping survey of all communal areas i.e. riser shaft, cleaners store, bin room/plant room, (to be undertaken by TPC appointed 3rd party certified contractors) and carry out work identified areas (both blocks). |
Fire Door Works | The service provider is to carry out fire door works as set out in the fire door schedule of works located within Appendix 3. All fire door works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works.Please note front entrance doors to fire door schedules in Appendix 3 include for tenanted and leasehold properties. The service provider is to use the property list in appendix 7 to identify residency type. The Service Provider and WCC are to agree upon consultation process for options of leaseholders to “opt in” for FED works. |
Work Element | Description of Works |
---|---|
Condition Survey | Blocks: AllA condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage. |
Access Required | Blocks: AllGenerally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals. |
Access Hatches/Door(s) | Blocks: AllSurvey/ review all current access doors/ hatch provisions, including any ladder access requirements.Optimised access solutions are to be proposed by the ServiceProvider giving due consideration to the size, positioning and specification of any new access doors/ hatches/ ladders required in order to facilitate future access requirements for plant maintenance/ replacement in a safe and efficient manner.Recommendations and proposals, with estimated costs, are to be provided by the Service Provider within their Project Execution Plan. |
Ductwork Cleaning | Blocks: AllSpecialist ductwork cleaning company to clean the existing ductwork system and in accordance with CIBSE/BSRIA and HVAC TR19 publications. All ductwork to be cleaned including the branch ductwork from inside each flat.Post clean report to be provided to include photos of pre and post condition. |
Extract Fans | Blocks: AllReplace existing extract fans, silencers, local ductwork, dampers and controls within the plantroom.The contractor is to ensure that there will be minimum down time and shall always be provided with extract ventilation.Works to comply with the current regulations. |
Ductwork, dampers and fittings | Blocks: AllSupply, install and connect all associated ductwork, dampers and fittings involved with replacing the fans. |
Electrical – Lighting | Blocks: AllSurvey / review existing lighting systems associated with The Works and, where necessary, replace existing/ install new systems to comply with current regulatory requirements and CIBSE recommended levels (minimum illumination of 200lux in all plant room spaces required).The Lighting installation is to include emergency lighting provisions in accordance with BS 5266 Emergency Lighting requirements.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken. |
In flat works | Blocks: AllClean local ductwork.Replace the grille and control damper.Install new/replace existing fire dampers.Improvements to make-up air/trickle vents. |
Electrical – power | Blocks: AllSurvey/ review existing electrical power supply installations associated with The Works and where necessary replace existing/ install new systems in compliance with current regulatory requirements.Small Power (240V) provision (minimum 1no double switched socket outlet) is to be provided in reasonably ‘close proximity’, and ideally ‘within’, all plant room spaces for future maintenance and essential repair operations.Provide a complete system of earthing and supplementary bonding installation to all items associated with The Works to meet the current edition of the IEE wiring regulations.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken.Replace existing containment systems for both power and lighting wiring.Provide supplementary earth bonding to external metallic containment. |
Existing plastic containment | Blocks: Brunswick and DalkeithProvide new containment which shall be metal powder coated. Installed in line with BS EN 50085-1:2005 and shall be suitably earthed.Note – containment to be sized as such that all existing cabling can be relocated from old plastic conduit and mounted within new powder coated containment |
Walkways/access | Blocks: AllSurvey/ review all existing walkway/ access route provisions and where deemed necessary provide proposals, with estimated costs, for the design, supply, install and/ or replace, repair, renovate or renew:Designated walkways to provide access for the future safe and efficient maintenance and/ or plant replacement of all CWST’s and associated components;Protective covers/ step-overs to any associated components that may cross over/ under the designated routes where deemed to be susceptible to future degradation in the absence of any such protective measures. |
Builders work | Blocks: AllCarry out all builders work in connection with The Works including subsequent making good of all disturbed finishes to a standard acceptable by WCC.Provide recommendations and for any builders-work style items felt necessary (such as any minor building-fabric style repairs or decorative items associated with The Works areas), for review and further instruction by WCC– a Provisional Sum in relation to any such works should be included at PEP stage;Replace/ make good/ repair existing water tank bunds if required. |
Maintaining Services | Blocks: AllMaintain the extract system during the duration of the contract. |
Associated Fire Safety Works | Blocks: AllCarry out all fire stopping associated with the works. All fire stopping works must be undertaken by an accredited party of an appropriate ‘industry-recognised’ body.Review all FRA’s and investigate/ establish Fire Strategies for the properties in relation to the areas affected by The Works. Identify all works deemed necessary and associated with The Works to ensure all Fire Strategy requirements are complied with. Provide recommendations, with estimated costs, for the execution of these works.Report findings with respect to recommendations to WCC for any further works that may be deemed appropriate in regard to Fire Protection matters for WCC consideration and further direction/ instruction.Ensure The Works are fully compliant with current Fire Regulatory requirements. |
Asbestos Survey | Blocks: AllComply with all statutory and regulatory requirements with respect to Asbestos. Ensure an asbestos R&D survey is carried out prior to any works being undertaken.Existing Asbestos registers have been provided as part of the Client Brief package of information where they exist. The Service Providers Project Execution Plan needs to identify any further works, with estimated costs, for assessing the information available and then for completing all necessary surveys/ works to identify and manage/ remove Asbestos hazards associated with The works. |
Other Potentially Hazardous Circumstances | Blocks: AllIn addition to Asbestos management (as noted above) there may be other potentially hazardous circumstances that the Service Provider will need to address.Undertake all surveys as necessary to establish the existence of all potentially hazardous materials, substances and/ or environmental conditions. Procure and execute all works necessary to clear away any such hazards to the extent necessary in order to facilitate future surveys and execution of The Works.Provide recommendations for any additional measures that may be deemed necessary to prevent re-contamination. |
O&M Manual | Blocks: AllProvide Health and Safety File and Operating & Maintenance manuals for all systems associated with The Works, to include (but not limited to);A detailed future Planned Preventative Maintenance (PPM) programme/ regime associated with The Works;Future Plant Replacement Strategies, with estimated costs, for each property for further review/ consideration/ instruction as appropriate, by CWH;As-built drawings, specifications, schematics, schedules, valves charts, etcManufacturers details and warranties (as applicable) |
Asset tagging | Blocks: AllAppoint an asset tagging company (Stics AMS or approved equivalent) to supply, install and carry out the installation, programming and commissioning of asset tags to new items upon completion of works.All main plant & equipment components associated with The is to be scheduled by the Service Provider within their PEP. The Service Provider is to provide a proposed Asset Tagging Register of all components for review and approval by WCC. |
Fire Safety works | Blocks: AllCarry out all relevant works identified and set out in the FRAs within Appendix 3 and compartmentation reports as carried out by the service provider. All fire safety works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works. Blocks: Brunswick and Dalkeith Fire Signage survey required – implement fire signage to current regulationsInstall new emergency lighting to staircase enclosures and corridors to BS5266Carry out fire stopping survey of all communal areas i.e. riser shaft, cleaners store, bin room/plant room, (to be undertaken by TPC appointed 3rd party certified contractors) and carry out work identified areas (both blocks). |
Fire Door Works | The service provider is to carry out fire door works as set out in the fire door schedule of works located within Appendix 3. All fire door works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works.Please note front entrance doors to fire door schedules in Appendix 3 include for tenanted and leasehold properties. The service provider is to use the property list in appendix 7 to identify residency type. The Service Provider and WCC are to agree upon consultation process for options of leaseholders to “opt in” for FED works. |
Work Element | Description of Works |
---|---|
Condition Survey | Blocks: AllA condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage. |
Access Required | Blocks: AllGenerally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals. |
Access Hatches/Door(s) | Blocks: AllSurvey/ review all current access doors/ hatch provisions, including any ladder access requirements.Optimised access solutions are to be proposed by the ServiceProvider giving due consideration to the size, positioning and specification of any new access doors/ hatches/ ladders required in order to facilitate future access requirements for plant maintenance/ replacement in a safe and efficient manner.Recommendations and proposals, with estimated costs, are to be provided by the Service Provider within their Project Execution Plan. |
Ductwork Cleaning | Blocks: AllSpecialist ductwork cleaning company to clean the existing ductwork system and in accordance with CIBSE/BSRIA and HVAC TR19 publications. All ductwork to be cleaned including the branch ductwork from inside each flat.Post clean report to be provided to include photos of pre and post condition. |
Extract Fans | Blocks: AllReplace existing extract fans, silencers, local ductwork, dampers and controls within the plantroom.The contractor is to ensure that there will be minimum down time and shall always be provided with extract ventilation.Works to comply with the current regulations. |
Ductwork, dampers and fittings | Blocks: AllSupply, install and connect all associated ductwork, dampers and fittings involved with replacing the fans. |
Electrical – Lighting | Blocks: AllSurvey / review existing lighting systems associated with The Works and, where necessary, replace existing/ install new systems to comply with current regulatory requirements and CIBSE recommended levels (minimum illumination of 200lux in all plant room spaces required).The Lighting installation is to include emergency lighting provisions in accordance with BS 5266 Emergency Lighting requirements.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken. |
In flat works | Blocks: AllClean local ductwork.Replace the grille and control damper.Install new/replace existing fire dampers.Improvements to make-up air/trickle vents. |
Electrical – power | Blocks: AllSurvey/ review existing electrical power supply installations associated with The Works and where necessary replace existing/ install new systems in compliance with current regulatory requirements.Small Power (240V) provision (minimum 1no double switched socket outlet) is to be provided in reasonably ‘close proximity’, and ideally ‘within’, all plant room spaces for future maintenance and essential repair operations.Provide a complete system of earthing and supplementary bonding installation to all items associated with The Works to meet the current edition of the IEE wiring regulations.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken.Replace existing containment systems for both power and lighting wiring.Provide supplementary earth bonding to external metallic containment. |
Existing plastic containment | Blocks: Brunswick and DalkeithProvide new containment which shall be metal powder coated. Installed in line with BS EN 50085-1:2005 and shall be suitably earthed.Note – containment to be sized as such that all existing cabling can be relocated from old plastic conduit and mounted within new powder coated containment |
Walkways/access | Blocks: AllSurvey/ review all existing walkway/ access route provisions and where deemed necessary provide proposals, with estimated costs, for the design, supply, install and/ or replace, repair, renovate or renew:Designated walkways to provide access for the future safe and efficient maintenance and/ or plant replacement of all CWST’s and associated components;Protective covers/ step-overs to any associated components that may cross over/ under the designated routes where deemed to be susceptible to future degradation in the absence of any such protective measures. |
Builders work | Blocks: AllCarry out all builders work in connection with The Works including subsequent making good of all disturbed finishes to a standard acceptable by WCC.Provide recommendations and for any builders-work style items felt necessary (such as any minor building-fabric style repairs or decorative items associated with The Works areas), for review and further instruction by WCC– a Provisional Sum in relation to any such works should be included at PEP stage;Replace/ make good/ repair existing water tank bunds if required. |
Maintaining Services | Blocks: AllMaintain the extract system during the duration of the contract. |
Associated Fire Safety Works | Blocks: AllCarry out all fire stopping associated with the works. All fire stopping works must be undertaken by an accredited party of an appropriate ‘industry-recognised’ body.Review all FRA’s and investigate/ establish Fire Strategies for the properties in relation to the areas affected by The Works. Identify all works deemed necessary and associated with The Works to ensure all Fire Strategy requirements are complied with. Provide recommendations, with estimated costs, for the execution of these works.Report findings with respect to recommendations to WCC for any further works that may be deemed appropriate in regard to Fire Protection matters for WCC consideration and further direction/ instruction.Ensure The Works are fully compliant with current Fire Regulatory requirements. |
Asbestos Survey | Blocks: AllComply with all statutory and regulatory requirements with respect to Asbestos. Ensure an asbestos R&D survey is carried out prior to any works being undertaken.Existing Asbestos registers have been provided as part of the Client Brief package of information where they exist. The Service Providers Project Execution Plan needs to identify any further works, with estimated costs, for assessing the information available and then for completing all necessary surveys/ works to identify and manage/ remove Asbestos hazards associated with The works. |
Other Potentially Hazardous Circumstances | Blocks: AllIn addition to Asbestos management (as noted above) there may be other potentially hazardous circumstances that the Service Provider will need to address.Undertake all surveys as necessary to establish the existence of all potentially hazardous materials, substances and/ or environmental conditions. Procure and execute all works necessary to clear away any such hazards to the extent necessary in order to facilitate future surveys and execution of The Works.Provide recommendations for any additional measures that may be deemed necessary to prevent re-contamination. |
O&M Manual | Blocks: AllProvide Health and Safety File and Operating & Maintenance manuals for all systems associated with The Works, to include (but not limited to);A detailed future Planned Preventative Maintenance (PPM) programme/ regime associated with The Works;Future Plant Replacement Strategies, with estimated costs, for each property for further review/ consideration/ instruction as appropriate, by CWH;As-built drawings, specifications, schematics, schedules, valves charts, etcManufacturers details and warranties (as applicable) |
Asset tagging | Blocks: AllAppoint an asset tagging company (Stics AMS or approved equivalent) to supply, install and carry out the installation, programming and commissioning of asset tags to new items upon completion of works.All main plant & equipment components associated with The is to be scheduled by the Service Provider within their PEP. The Service Provider is to provide a proposed Asset Tagging Register of all components for review and approval by WCC. |
Fire Safety works | Blocks: AllCarry out all relevant works identified and set out in the FRAs within Appendix 3 and compartmentation reports as carried out by the service provider. All fire safety works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works. Blocks: Brunswick and Dalkeith Fire Signage survey required – implement fire signage to current regulationsInstall new emergency lighting to staircase enclosures and corridors to BS5266Carry out fire stopping survey of all communal areas i.e. riser shaft, cleaners store, bin room/plant room, (to be undertaken by TPC appointed 3rd party certified contractors) and carry out work identified areas (both blocks). |
Fire Door Works | The service provider is to carry out fire door works as set out in the fire door schedule of works located within Appendix 3. All fire door works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works.Please note front entrance doors to fire door schedules in Appendix 3 include for tenanted and leasehold properties. The service provider is to use the property list in appendix 7 to identify residency type. The Service Provider and WCC are to agree upon consultation process for options of leaseholders to “opt in” for FED works. |
Work Element | Description of Works |
---|---|
Condition Survey | Blocks: AllA condition survey to be carried out within all areas likely to be affected by the working areas by the Service Provider which shall contain written and photographic evidence of the existing conditions. The Service Provider is to identify any areas of concern that may result in additional works being necessary, together with proposed remedial recommendations, within the scope of works. The condition survey is to be agreed with WCC and upon conclusion of the works the Service Provider is to ensure the condition of any areas affected by the works are handed over to WCC in no worse a condition than at pre-commencement stage. |
Access Required | Blocks: AllGenerally, current maintenance access is via existing plantroom doors, hatches and the like. The Service Provider will need to acquaint themselves with the access arrangements available and provide block-specific proposals to facilitate the works necessary. It is anticipated that these proposals will be optimised to provide the best value-for-money project-wide access proposals. |
Access Hatches/Door(s) | Blocks: AllSurvey/ review all current access doors/ hatch provisions, including any ladder access requirements.Optimised access solutions are to be proposed by the ServiceProvider giving due consideration to the size, positioning and specification of any new access doors/ hatches/ ladders required in order to facilitate future access requirements for plant maintenance/ replacement in a safe and efficient manner.Recommendations and proposals, with estimated costs, are to be provided by the Service Provider within their Project Execution Plan. |
Ductwork Cleaning | Blocks: AllSpecialist ductwork cleaning company to clean the existing ductwork system and in accordance with CIBSE/BSRIA and HVAC TR19 publications. All ductwork to be cleaned including the branch ductwork from inside each flat.Post clean report to be provided to include photos of pre and post condition. |
Extract Fans | Blocks: AllReplace existing extract fans, silencers, local ductwork, dampers and controls within the plantroom.The contractor is to ensure that there will be minimum down time and shall always be provided with extract ventilation.Works to comply with the current regulations. |
Ductwork, dampers and fittings | Blocks: AllSupply, install and connect all associated ductwork, dampers and fittings involved with replacing the fans. |
Electrical – Lighting | Blocks: AllSurvey / review existing lighting systems associated with The Works and, where necessary, replace existing/ install new systems to comply with current regulatory requirements and CIBSE recommended levels (minimum illumination of 200lux in all plant room spaces required).The Lighting installation is to include emergency lighting provisions in accordance with BS 5266 Emergency Lighting requirements.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken. |
In flat works | Blocks: AllClean local ductwork.Replace the grille and control damper.Install new/replace existing fire dampers.Improvements to make-up air/trickle vents. |
Electrical – power | Blocks: AllSurvey/ review existing electrical power supply installations associated with The Works and where necessary replace existing/ install new systems in compliance with current regulatory requirements.Small Power (240V) provision (minimum 1no double switched socket outlet) is to be provided in reasonably ‘close proximity’, and ideally ‘within’, all plant room spaces for future maintenance and essential repair operations.Provide a complete system of earthing and supplementary bonding installation to all items associated with The Works to meet the current edition of the IEE wiring regulations.Provide Electrical Installation Condition Report (EICR) and all appropriate certification associated with The Works undertaken.Replace existing containment systems for both power and lighting wiring.Provide supplementary earth bonding to external metallic containment. |
Existing plastic containment | Blocks: Brunswick and DalkeithProvide new containment which shall be metal powder coated. Installed in line with BS EN 50085-1:2005 and shall be suitably earthed.Note – containment to be sized as such that all existing cabling can be relocated from old plastic conduit and mounted within new powder coated containment |
Walkways/access | Blocks: AllSurvey/ review all existing walkway/ access route provisions and where deemed necessary provide proposals, with estimated costs, for the design, supply, install and/ or replace, repair, renovate or renew:Designated walkways to provide access for the future safe and efficient maintenance and/ or plant replacement of all CWST’s and associated components;Protective covers/ step-overs to any associated components that may cross over/ under the designated routes where deemed to be susceptible to future degradation in the absence of any such protective measures. |
Builders work | Blocks: AllCarry out all builders work in connection with The Works including subsequent making good of all disturbed finishes to a standard acceptable by WCC.Provide recommendations and for any builders-work style items felt necessary (such as any minor building-fabric style repairs or decorative items associated with The Works areas), for review and further instruction by WCC– a Provisional Sum in relation to any such works should be included at PEP stage;Replace/ make good/ repair existing water tank bunds if required. |
Maintaining Services | Blocks: AllMaintain the extract system during the duration of the contract. |
Associated Fire Safety Works | Blocks: AllCarry out all fire stopping associated with the works. All fire stopping works must be undertaken by an accredited party of an appropriate ‘industry-recognised’ body.Review all FRA’s and investigate/ establish Fire Strategies for the properties in relation to the areas affected by The Works. Identify all works deemed necessary and associated with The Works to ensure all Fire Strategy requirements are complied with. Provide recommendations, with estimated costs, for the execution of these works.Report findings with respect to recommendations to WCC for any further works that may be deemed appropriate in regard to Fire Protection matters for WCC consideration and further direction/ instruction.Ensure The Works are fully compliant with current Fire Regulatory requirements. |
Asbestos Survey | Blocks: AllComply with all statutory and regulatory requirements with respect to Asbestos. Ensure an asbestos R&D survey is carried out prior to any works being undertaken.Existing Asbestos registers have been provided as part of the Client Brief package of information where they exist. The Service Providers Project Execution Plan needs to identify any further works, with estimated costs, for assessing the information available and then for completing all necessary surveys/ works to identify and manage/ remove Asbestos hazards associated with The works. |
Other Potentially Hazardous Circumstances | Blocks: AllIn addition to Asbestos management (as noted above) there may be other potentially hazardous circumstances that the Service Provider will need to address.Undertake all surveys as necessary to establish the existence of all potentially hazardous materials, substances and/ or environmental conditions. Procure and execute all works necessary to clear away any such hazards to the extent necessary in order to facilitate future surveys and execution of The Works.Provide recommendations for any additional measures that may be deemed necessary to prevent re-contamination. |
O&M Manual | Blocks: AllProvide Health and Safety File and Operating & Maintenance manuals for all systems associated with The Works, to include (but not limited to);A detailed future Planned Preventative Maintenance (PPM) programme/ regime associated with The Works;Future Plant Replacement Strategies, with estimated costs, for each property for further review/ consideration/ instruction as appropriate, by CWH;As-built drawings, specifications, schematics, schedules, valves charts, etcManufacturers details and warranties (as applicable) |
Asset tagging | Blocks: AllAppoint an asset tagging company (Stics AMS or approved equivalent) to supply, install and carry out the installation, programming and commissioning of asset tags to new items upon completion of works.All main plant & equipment components associated with The is to be scheduled by the Service Provider within their PEP. The Service Provider is to provide a proposed Asset Tagging Register of all components for review and approval by WCC. |
Fire Safety works | Blocks: AllCarry out all relevant works identified and set out in the FRAs within Appendix 3 and compartmentation reports as carried out by the service provider. All fire safety works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works. Blocks: Brunswick and Dalkeith Fire Signage survey required – implement fire signage to current regulationsInstall new emergency lighting to staircase enclosures and corridors to BS5266Carry out fire stopping survey of all communal areas i.e. riser shaft, cleaners store, bin room/plant room, (to be undertaken by TPC appointed 3rd party certified contractors) and carry out work identified areas (both blocks). |
Fire Door Works | The service provider is to carry out fire door works as set out in the fire door schedule of works located within Appendix 3. All fire door works are to be undertaken by an accredited third party of an appropriate ‘industry-recognised’ body. A full report should be provided on completion of the works, to include photos of pre and post condition as part of the “Condition Survey” element of works.Please note front entrance doors to fire door schedules in Appendix 3 include for tenanted and leasehold properties. The service provider is to use the property list in appendix 7 to identify residency type. The Service Provider and WCC are to agree upon consultation process for options of leaseholders to “opt in” for FED works. |
Published: 22 January 2021
Last updated: 26 November 2024